Sneak peek

Went to the wig manufacturer during my lunch break today to see what's the progress of the wigs. It's about 80% done for all and should be ready by the mid of November as told.

This is wig 1, 95% done, some final touching up required.
The lady even combed and clipped up the fringe for me to take photo.
This is wig 6, ventilating required (see below).
Ventilating is very labour intensive process. It required a lot of patient and good eyesight. This lady is doing it strand by strand and from this photo, you can tell that she is not young.